
Add to Cart
Various Types Valve Body Castings for Gate Globe Safety Check Valve
Specification
Material | Aluminum, Zinc Aluminum, Bronze, Copper, Brass, Stainless Steel, Steel, Ductile Iron, Grey Iron, and customized material from clients. |
Material Grade | ASTM, DIN, GB, BS, JIS, AISI, NF, etc |
Process | Sand Casting, ESR casting, Die Casting, Investment casting |
Weight | 0.1kg- 200kg |
Tolerance | CT 7-12 grade, and based on the custom drawings |
Drawing (files) format | Igs, Stp, X-T PDF, Jepg, Jpg |
Capabilities of Production | Aluminum: More than 800 Mt per month. |
Stainless Steel: More than 50 Mt per month. | |
Surface Treatment | Anodize/Zinc Plating/ Nickel Plating, Tinting/ Polishing/Blacking, etc |
MOQ | Depends on the items, please contact us for |
Heat Treatment | Quenching, Normalizing, Annealing, Plating,Carburizing |
Applications | Automotive, Agricultural Machines, vessels, Tooling, Mining, Oil & gas industry, Locomotive industry, Aerospace, Hardware, Construction, Engineering Machine, Electrical Equipment, etc |
Machining Equipment | Threading, Turning, Milling, Grinding, CNC/NC, Boring, Test facilities |
Measuring Tools | Gauge, Thread gauge, Height Gauge, Vernier caliper, Depth caliper, Micrometer, CMM, etc |
QC System | Fully inspection before Delivery |
Available Service | OEM & ISO |
Payment Terms | L/C, D/A, D/A,T/T, PayPal |
Shipment Terms | FOB, CIF |
Samples | Few Samples are acceptable |
Certification | IS9001:2008. TS16949 |
Tooling leadtime | 15-25 working days |
Production leadtime | 15 working days, based on the quantity of demand |
Ductile iron valve fittings have the characteristics of high compressive strength and excellent elongation.
Without reducing compressive strength, they can reduce the weight of the valve and reduce the purchase cost.
Our company can undertake nodular iron and gray iron valve body castings.
FAQ
How long is the new product development cycle?
The mold making period of new product is 30 days.
What's the time for new product sample making?
20 days.
How to ensure product quality?
Using the national table pig iron, the molten iron was detected by the rapid analyzer before the smelting time,
and the material was adjusted.
What’s the inspection equipment ?
There are fast analyzer before furnace, Jin Xiangyi, hardness tester, tensile testing machine,
product testing equipment is complete.
How long will the batch production take?
The new product can be produced in bulk within 25 days after the confirmation of the new product, and a container can be completed every month